gd-system-plugin
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/wp-includes/functions.php on line 6114Address:
Force55 Ltd
Royal Quays Business Centre
North Shields
NE29 6DE
Tel:
+44 (0) 7817591168
Email:
patrick.bell@force55.com
Force55 have been successful in installing and operating MarineSteam® RF-Mesh on a sector of the Humber Gateway OREI.
Read MoreUnasys have selected Force55 Ltd to assist in the TIGGOR program that seeks to accelerate innovative technology concepts in key areas of operations and maintenance for offshore wind, including remotely operated vehicles (ROVs), digital twins, cable arrays and sensors.
Read MoreThe F55 PTS Fob in-field testing has confirmed that the PTS design holds some redundancy in the coverage provision with a range of 1.3km maintained.
Read MoreForce55 Ltd have agreed the installation of systems and pull-through testing within the OREC (Robotic and Autonomous Systems (RAS) remote-field test-site zone, some 7.2km East of Blyth.
Read More